Road construction and maintenance projects


Ohio Department of Transportation Districts 1 and 7



ALLEN COUNTY

Interstate 75 between Napoleon Road and state Route 235, just south of the village of Beaverdam to three miles north of the village of Bluffton, in Allen and Hancock counties, will experience lane restrictions and ramp closures for paving and reconstruction through November 2020. Visit the project page for more information.

Nighttime lane restrictions, 7 p.m. – 7 a.m.

State Route 65/Elm Street and Pine Street at their intersection in the city of Lima closed June 1 for replacement of the bridges over the Ottawa River. Completion is expected in late fall. Visit the project page for more information.

The bridges at Elm Street and Pine Street are closed at the intersection of Elm Street and Pine Street.

Eastbound detour: Central Avenue to Market Street to Bellefontaine Avenue (SR 309/SR 117).

Westbound detour: Bellefontaine Avenue (SR 309/ SR 117) to Market Street to S. Union Street.

State Route 501 and Fort Amanda Road will have lane restrictions at the intersection for the removal of an overhead light. Four new signs that utilize LED flashing lights and icons to notify drivers of the intersection ahead have already been installed to replace the overhead flashing light.

HANCOCK COUNTY

Interstate 75 Widening and Reconstruction in the city of Findlay: The project to reconstruct and widen I-75 through the city of Findlay beginning just south of Harrison Street/County Road 144, which is just south of the U.S. Route 68/State Route 15 interchange, to the County Road 99 interchange, is in its fourth and final year. Estimated completion: Fall 2020

All ramps are open, and the final traffic pattern is in place.

Construction will continue until late fall with lane restrictions and temporary ramp closures.

Interstate 75 between Napoleon Road and state Route 235, just south of the village of Beaverdam to three miles north of the village of Bluffton, in Allen and Hancock counties, will experience lane restrictions and ramp closures for paving and reconstruction through November 2020. Visit the project page for more information.

Nighttime lane restrictions, 7 p.m. – 7 a.m.

U.S. 68 over State Route 15 and State Route 15 under U.S. 68, south of the city of Findlay, will have lane restrictions for finish work on the U.S. 68 bridge deck replacement project. Visit the project page for more information.

U.S. 68 within the village of Arlington is open following a four-month closure for roadway reconstruction. Lane restrictions are expected to continue for finish work.

Various routes in the village of Arlington will have lane restrictions for local road repairs.

U.S. 224 resurfacing project between the village of Ottawa and State Route 235 will have lane restrictions from the Putnam County line to State Route 235 for finish work.

State Route 568 closure between County Road 7 and Township Road 245, two miles east of Findlay, will close Aug. 10 for approximately 120 days for a bridge replacement project.

Detour: SR 37 to SR 15 to SR 330 back to SR 568.

HARDIN COUNTY

Lincoln Street/township Road 44 within the village of Ada, between Klingler Road and Union Street, closed for approximately 160 days on Apr. 20 for roadway reconstruction including storm sewer, water main, curb and gutter, and sidewalk.

Southern Detour: Main Street/SR 235 to Lima Avenue/TR 50 to Klinger Road/County Road 35.

Northern Detour: Main Street/SR 235 to W. North Avenue/SR 81 to Klinger Road/County Road 35.

Access to Ada Medical and Diagnostic Center will be maintained at all times.

PUTNAM COUNTY

U.S. 224 resurfacing project between the village of Ottawa and State Route 235 will have lane restrictions from the Putnam County line to State Route 235 for finish work.

State Route 65 in the village of Leipsic, between T-6 and C-5, will close October 29 for one week for railroad repair.

Detour: SR 613 to SR 109 to SR 18 back to SR 65.

State Route 190 between Road T-Q and Road C-R, north of the village of Fort Jennings, closed October 19 for five days for a culvert replacement. Due to unforeseeable circumstances the route will remain closed until Monday, Oct. 26.

Detour: SR 634 to U.S. 224 back to SR 190.

VAN WERT COUNTY

U.S. 30 at U.S. 224, both eastbound and westbound, Van Wert, will be restricted to one lane through the work zone beginning Aug. 10 for a project that will reconstruct and lower the pavement beneath the U.S. 224 overhead to increase vertical clearance. The project also includes drainage work, and replacement of barrier wall and guardrail. The project is expected to be completed late October.

U.S. 30 traffic will be maintained in one lane in each direction.

Liberty Union Road from U.S. 30 to Terry Road will close Aug. 10 for approximately three months.

Multi-route paving project will begin work Aug. 10. The project includes resurfacing of the existing pavement, pavement repairs, work on curb ramps, and widening of bridge approaches on U.S. 224.

Paving is complete, lane restrictions may occur for finish work on the routes listed below.

U.S. 127 from the CSX Railroad line north of Main St. to the intersection of U.S. 127, U.S. 224, and Marsh Rd.

SR 709 from SR 118 to Township Road 58.

https://www.limaohio.com/wp-content/uploads/sites/54/2020/10/web1_ConstructionBarrels-2.jpg

Ohio Department of Transportation Districts 1 and 7

Post navigation